Construction, testing, commissioning and other on-site activities (including some onshore design and engineering services) that are related to the work. In order to complete the splitting structure, an agreement is drawn up to “circle” the obligations of land and extraterrestrial contractors to the project company, so that any deficiencies resulting from the splitting structure are properly filled. Normally, the parties to this agreement – often referred to as the Coordinating Agreement or Around Guarantee (WAG) – are the project company and the offshore contractor or its parent company. The project company`s remedy in the event of a failure of the performance of the land contractor or offshore contractor is solely the counterpart of the WAG. It is tempting to say that the liability ceiling should be distributed in this way beyond contracts: land liability is limited to 100% of the land price; Similarly, liability at sea is limited to 100% of the offshore price and total liability under the framework contract is limited to 100% of the total amount of offshore/onshore prices. In addition, demerger contracts face the risk of delays between contractors, such as delays in offshore transfer. B delays in transfers at sea, insanity caused by delays in land receiving operations and storage costs for delivery by offshore contractors outside of scheduled periods. All of this needs to be carefully considered. This could of course be dealt with under the framework agreement, but since land and offshore splitting contracts cannot relate to the framework agreement, these demerger contracts must nevertheless provide for a coherent starting position consistent with their divided relationship and with the framework agreement.

In a case recently decided by the High Court in England and Wales – Petroleum Company of Trinidad and Tobago Ltd v Samsung Engineering Trinidad Co Ltd [2017] EWHC 3055 (TCC) – an employer conducted arbitration proceedings by incorrectly referring to the land contract and the price of the onshore contract. This meant that the contractor was entitled, under the framework contract, to a floor for damages liquidated on the basis of 10% of the land contract price, excluding the combined prices of the contracts. This means that the developer has actually been placed in a less favourable position as a result of the shared contract structure. If the contract is split, technical specifications and drawings must be carefully drawn so that technical specifications and designs can work independently of each other. The risk of gaps between shared technical specifications and drawings should be assigned to a given party in order to preserve a single area of responsibility. This party, which assumes the risk of “gaps,” could be the land contractor who completed the project as the last contractor; the parent who provides a mother guarantee or onshore and extraterrestrial contractors in the framework contract. A safer way for the developer would have been to spread the liability ceiling in this way: land liability is limited to 100% of total offshore/onshore prices; Offshore liability is capped in the same way and overall responsibility under the framework contract is intended to clarify that land and offshore liability should always be limited to 100% of total offshore/terrestrial prices. In order to protect the developer`s interests, onshore and offshore contractors are usually required to take a cross umbrella or coordination or wraparound with the developer.

April 9, 2021 - Posted by | Uncategorized